Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the awesome-weather-pro domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/cruzorg/bb.cruz511.org/wp-includes/functions.php on line 6260
Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the heartbeat-control domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/cruzorg/bb.cruz511.org/wp-includes/functions.php on line 6260
Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the om_shortcodes domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/cruzorg/bb.cruz511.org/wp-includes/functions.php on line 6260
Deprecated: The called constructor method for WP_Widget class in html_javascript_adder_widget is deprecated since version 4.3.0! Use __construct() instead. in /home/cruzorg/bb.cruz511.org/wp-includes/functions.php on line 6260 Highway 9 One-Way Traffic Control Continues Through 2/3 – CRUZ511
Notice: Undefined index: id in /home/cruzorg/bb.cruz511.org/wp-content/themes/cruz511/functions.php on line 52
Home/Alert Archive/ Highway 9 One-Way Traffic Control Continues Through 2/3
Highway 9 One-Way Traffic Control Continues Through 2/3
Published
Highway 9 Device Installation Operations to Result in One-Way Traffic Control Through Tuesday February 3
Travelers will continue to encounter one-way traffic control in both directions of Highway 9 for the installation of devices designed to keep birds from nesting within structures.
Work will continue Saturday Jan. 31, Monday Feb. 2 thru Tuesday Feb. 3 on Hwy. 9 from 7 am to 4 pm. near Boulder Creek at the San Lorenzo River Bridge and Kings Creek Bridge.
Delays should not exceed 10 minutes and travelers are asked to allow extra time for their commute through the area.