Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the awesome-weather-pro domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/cruzorg/bb.cruz511.org/wp-includes/functions.php on line 6260
Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the heartbeat-control domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/cruzorg/bb.cruz511.org/wp-includes/functions.php on line 6260
Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the om_shortcodes domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/cruzorg/bb.cruz511.org/wp-includes/functions.php on line 6260
Deprecated: The called constructor method for WP_Widget class in html_javascript_adder_widget is deprecated since version 4.3.0! Use __construct() instead. in /home/cruzorg/bb.cruz511.org/wp-includes/functions.php on line 6260 Santa Cruz Trestle Bridge Closed Mar 7-8 – CRUZ511
Notice: Undefined index: id in /home/cruzorg/bb.cruz511.org/wp-content/themes/cruz511/functions.php on line 52
The City of Santa Cruz is scheduled to close access to the Railroad Trestle Bridge in order to install a transducer and associated components beginning Wednesday, March 7, through Thursday, March 8.
This project will permit measurements of river level and tidal surge needed as part of the City’s flood control work by sending an ultrasonic signal that bounces off the water and back.
The construction schedule is predicated on clear weather; any changes will be posted on the City website at www.cityofsantacruz.com.
The City apologizes for any inconvenience this work may cause and appreciates the public’s cooperation.